top of page
Lindco Logo (2).png

Work We Have Done:

8.jpg
5.jpg

El Nido Substation Circuit Relocations

​

A unique project to install underground substructures to relocate two circuits from overhead to underground leaving the substation. Schedule end date was paramount for this project. Lindco was able to pull together decades of combined experience to complete this job with time to spare, with no incidents or accidents and under budget.

Airways 1104 and 1107
​
The project called to install 2 new circuits from the Airways substation that would add capacity and reliability to growing communities on the east side of Fresno and Clovis. This job involved locating and verifying existing vacant conduits and installing new conduits to build out both circuits. Fifteen new equipment vaults were installed to intercept the existing vacant conduit. Approximately 3100 lf of new conduit was trenched or placed by HDD along with an additional seven equipment vaults to complete the underground substructure build for the two new circuits. Lindco completed the underground build and full restoration to the areas affected by construction activities on time, under budget and with no incidents or accidents.

Silverado 2104 Reconductor – Tier 3 Wildfire Hardening

​

This project called to underground a section of overhead primary in a Tier 3 wildfire area. The area is extremely rocky and could have posed some challenges to trench. The Lindco construction team tasked with this build utilized specialized rock trenching equipment to execute the trenching in record time. This project was completed weeks earlier than anticipated due to the experience of the team. No incidents or accidents and under budget.

CSLB: 687884

DBE: 40437

WBE: 10100003

209-876-1554

  • Facebook - White Circle
Mailing Address: 
P.O. Box 545
Hughson California 95326
bottom of page